Cub Work Session #206

We had enough people today to work on both the fuselage and the wing. On the fuselage, reinforcements were added under the floorboards, which was a modification recommended at Oshkosh by the Cub Doctor. It was also decided that our fabricated ground plane for the antennas needed to be larger, so that whole assembly came out and is being redesigned. On the wing, we measured out and chalk lined the locations for rib laces on the top of the wing. We then put down reinforcing tape and punched holes. Once this is also done for the bottom of the wing we will be ready for rib lacing. The next work session will be Wednesday, November 7th at 9:30.
 