Cub Work Session #46

Work continued on the left wing today. With disassembly pretty much complete, we focused mainly on cleaning. Paint remover and acetone were used to remove fabric glue, dirt, and surface corrosion. After a while of this, we had to air out the hangar. Meanwhile, Jerry compiled a list of all the things we did to the right wing that will go into the airframe log. Jerry and Mike also repaired one of the compression struts by using a left over insert from one of the right wing struts. With seven of us working, good progress was made, but there is still plenty to be done. The next work session will be Saturday December 17th weather permitting. (Right now, the forecast doesn't look so good.)