We had a smaller group than usual for a Saturday, but still made steady progress on the Cub. The front of the upper side interior fabric was finally fitted and glued in place. Because of the curves involved, it took a long time and many hands to get that part right. Meanwhile, work continued on the ground plane for the ELT antenna. The original design proved to have too much play in it, so an additional brace was fashioned for it. Fabric work on one of the horizontal stabilizers was also completed. The plan is to cover all of the control surfaces before doing the brush coats and rib stitching. The project will continue on Wednesday, March 14th at 9:30.
 